PortInsight.io › Ports › Rotterdam › Reports
Rotterdam port congestion, October 2026
In October 2026, commercial vessels in Rotterdam spent a median of 12.5 h at anchorage, across 1,778 completed stays. That is 30% shorter than in September 2026 (17.8 h). One in ten stays lasted 72 hours or more. The longest daily median was on 22 Oct (20.0 h).
What stood out
- Ships spent 30% less time at anchor than in September 2026.
- Tankers waited longest (19.3 h), passenger ships the shortest (2.0 h).
- Waits spiked on 22 Oct, when the daily median reached 20.0 h, 60% above the month as a whole.
- About one ship in 10 was still at anchor after 72 hours.
Key figures
- Median time at anchorage (excl. bunkering and lay-up)
- 12.5 h
- Ships still at anchor after 72 hours
- 10%
- Completed anchorage stays
- 1,778
- Completed stays on a typical day
- 57.4
- Ships at anchor at any one time
- 71
Daily median time at anchorage
| Day | Median | Stays |
|---|---|---|
| 1 Oct | 10.1 h | 60 |
| 2 Oct | 8.9 h | 75 |
| 3 Oct | 16.1 h | 69 |
| 4 Oct | 6.6 h | 58 |
| 5 Oct | 12.7 h | 64 |
| 6 Oct | 5.4 h | 58 |
| 7 Oct | 16.2 h | 67 |
| 8 Oct | 12.1 h | 75 |
| 9 Oct | 7.5 h | 61 |
| 10 Oct | 14.2 h | 60 |
| 11 Oct | 9.8 h | 69 |
| 12 Oct | 13.1 h | 50 |
| 13 Oct | 10.3 h | 51 |
| 14 Oct | 11.9 h | 53 |
| 15 Oct | 16.0 h | 57 |
| 16 Oct | 11.8 h | 64 |
| 17 Oct | 12.2 h | 48 |
| 18 Oct | 17.8 h | 38 |
| 19 Oct | 17.8 h | 57 |
| 20 Oct | 18.4 h | 57 |
| 21 Oct | 11.9 h | 60 |
| 22 Oct | 20.0 h | 41 |
| 23 Oct | 12.1 h | 44 |
| 24 Oct | 13.3 h | 44 |
| 25 Oct | 13.8 h | 34 |
| 26 Oct | 13.4 h | 48 |
| 27 Oct | 12.3 h | 40 |
| 28 Oct | 9.1 h | 66 |
| 29 Oct | 12.4 h | 66 |
| 30 Oct | 4.9 h | 58 |
| 31 Oct | 17.3 h | 86 |
Longest days
- 22 Oct: 20.0 h median, 41 stays
- 20 Oct: 18.4 h median, 57 stays
- 18 Oct: 17.8 h median, 38 stays
By vessel type
| Vessel type | Stays | Median at anchorage |
|---|---|---|
| Cargo | 736 | 9.1 h |
| Tanker | 724 | 19.3 h |
| Container | 204 | 12.7 h |
| Passenger | 30 | 2.0 h |
Other ports in October 2026
- Singapore: 16.7 h
- Hamburg: 9.7 h
- Los Angeles: 12.0 h
- Yokohama: 13.6 h
- Busan: 13.5 h
What shapes anchorage time in Rotterdam
Rotterdam is Europe’s largest port. Its anchorages lie offshore in the North Sea, where ships wait for a berth, for a pilot, or for orders. The deepest-draught tankers and bulk carriers are also bound by tidal windows in the approach channel, which can add hours to a stay at anchor. Tankers and bulk carriers usually make up most of the anchored ships.
Questions about Rotterdam in October 2026
How long do ships wait at anchor in Rotterdam?
In October 2026, commercial ships spent a median of 12.5 h at anchor in Rotterdam, based on 1,778 completed stays. One in ten ships was still at anchor after 72 hours. Bunkering anchorages are not included.
Which ships wait longest at anchor in Rotterdam?
In October 2026: tankers 19.3 h, container ships 12.7 h, cargo ships 9.1 h, passenger ships 2.0 h (median time at anchor, types with at least 20 stays).
Is Rotterdam more congested than other major ports?
Rotterdam had the 4th longest median time at anchorage of the 6 ports PortInsight tracks in October 2026. Among the others, the longest was Singapore (16.7 h) and the shortest Hamburg (9.7 h). Ports use their anchorages differently, so each is best compared with its own history.
How many ships are at anchor in Rotterdam?
In October 2026, an average of 71 commercial ships were at anchor in the port area at any one time. That is the total time ships spent at anchor divided by the length of the month, so it is measured from the same stays as the median rather than counted separately.
Is Rotterdam port congested right now?
This report covers October 2026. For current conditions, the live Rotterdam tracker on PortInsight shows ships at anchor, time at anchorage and the congestion level, updated continuously from AIS data.
How to read this report
- Median time at anchorage
- Half of the ships spent less time at anchor than this, half spent more. Unlike an average, a few very long stays do not pull it up.
- 1 in 10 ships waited longer than
- The 90th percentile. It shows how long the slowest tenth of ships waited, which is what matters when you plan for a bad case rather than a typical one.
- Still at anchor after 72 hours
- Stays are tracked for at most 72 hours. Where enough ships reach that limit, the 90th percentile would simply read "72 h" for every busy port, so the share of ships that reached it is shown instead.
- Ship stays per day
- How many ships completed a stay at anchor on a typical measured day. The median says how long ships stayed; this says how many there were, which is the difference between a busy port and a slow one.
- Ship stays
- Each time a commercial ship anchored in the port area and later left, counted in the month it left. A ship that anchors twice counts twice.
- Not the same as the berth queue
- Ships anchor for many reasons besides waiting for a berth: orders, fuel, crew, supplies or a tidal window. This report measures all time at anchor, which makes it a different measure from the berth-queue figures other sources publish, not simply a higher one — it reads higher where ships anchor for other reasons, and lower where they wait outside the monitored area.
Coverage and data quality
1,778 completed stays, measured on 31 of 31 days; 10% of stays reached the 72-hour tracking limit and count as 72 hours.
How these figures are measured
Measured from public AIS data: completed stays at anchor inside the port area by commercial vessels (IMO number, 100 m and longer), by the month the vessel left the anchorage. Bunkering and lay-up anchorages are excluded from the headline and bunkering is reported separately. Stays are tracked for at most 72 hours; longer stays count as 72 hours, so P90 values at the cap are shown as "≥72 h". The figure covers all time at anchorage, not only the queue for a berth, so it is a different measure from the berth-queue figures published elsewhere and can read higher or lower than them.
The series starts in September 2026, when PortInsight moved to a new AIS data provider. Earlier months are not comparable and are not published.